Nobody loses real money picking the wrong shade of oak. The expensive mistakes in a project are the other kind: a lounge chair with no fire documentation for a public space, seating that cannot take round-the-clock use, an acoustic problem discovered after move-in — the mistakes an inspector or an operations manager finds, months after the mood board was approved. This section exists for that side of the job: the side the specification has to survive.
For each project type you will find the same structure: which families of requirements actually matter in that context, the mistake specifiers make most often, what belongs in the specification, and which collections answer. With one rule stated up front: a product's suitability is what its manufacturer has declared and documented — the certificate is theirs, quoted under their name, and where a document does not exist we say so rather than write around it.
The workplace, our core trade, is covered down to its smallest rooms: executive offices, open plan and operative floors, meeting rooms, reception, waiting areas, break areas, outdoor space, washrooms, and the acoustic treatment that makes an open plan livable — because a real project does not end at the desks. Each environment has its own logic, and pretending one chair fits all of them is how fit-outs age badly.
The four project types: Office Projects, Hospitality projects, Healthcare projects and Education projects.